NORDIK WINDOWS & DOORS NEW OFFICE & WAREHOUSE – EXCAVATION

The project is a new 12,000m2 warehouse and office building on an expansive 20-acre site. Our scope of work consists of site clea­ring, stripping, and grading, excavation of a storm retention pond, nearly a kilometer of storm pipe as well as excavation and stone backfill for the warehouse and office building as well as the large 17,000m2 asphalt area and concrete aprons.


A 3m diameter by 5m deep Oil Grit Separator manhole was installed.  This manhole will filter sediment from the storm water leaving the site.


Five 45,000-liter fire tanks were installed. The tanks measured 6m x 3m x 4m and weighed 41,000 kgs each. These precast concrete tanks will store the water needed to supply the building fire suppression system in case of a fire. A sump manhole measuring 1.8m in diameter and about 5m deep was also installed next to the tank followed by one last run of storm pipe with 3 catch basins.


Our attention has now turned to finishing touches across the site including final grading, paving, and landscaping keeping the project well on track for completion in summer 2026.

Like What you See?

At Louis W. Bray Construction, we are committed to delivering excellence in every build. Ready to start your next project? Book a call with our team today!