Clients:
- Melanie Construction
- Township of Russell
- McIntosh Perry Consulting Engineers
- Modifications/updates to existing pumping station and sanitary sewer upgrades – all while maintaining full operation of the station with bypass pumping
- Forcemain and watermain across the Castor River via directional drilling
- 8m deep shoring & construction of new wet well, including 3 new 105HP pumps and all associated mechanical and electrical components
- Construction of New Pump Station Control Building including all Electrical & Mechanical components.
- 7m deep excavation for new gravity sewer connecting to new wet well with isolation gate
- 5000 m of 300mm sanitary force-main by directional drill to connect new pump station to existing lagoon, including 11 air release chambers and new air release valves. A portion of this force-main had to be open cut and hoe-rammed through rock.