top of page

PROJECT #766 - MISEMA RIVER BRIDGE


Project location: Kirkland Lake, ON - Misema River


Project team:

  • Operations Manager - Chace Albright

  • Project Manager - Dominick Violante

  • Site Super - Nathan St Louis

Project duration:

Project Start: June 2021

Project Completion: November 2021


Site Info:

  • Subcontract to J& P Leveque

  • Partial Depth Concrete repairs to Deck, Abutments, Piers, & Barrier walls

  • Waterproof Deck

  • Concrete Sealer

  • Thermally Sprayed Anode



3 Comments


The post about the Misema River Bridge reminded me how structure and precision define success in both engineering and academics. When I struggled to find that same structure in solving equations, I turned to help with algebra class from The Online Class Help. Their guidance gave me a clear framework much like a bridge’s foundation, turning complex problems into manageable steps and helping me rebuild my confidence in mathematics.

Like

Impressive planning and execution for such a complex project as the Misema River Bridge! Academic endeavors, particularly at the PhD level, similarly demand meticulous project design and structural integrity in their proposals. For aspiring PhD candidates, ensuring their research proposal is flawlessly detailed and persuasive is paramount. Many wisely seek PhD research proposal editing help to achieve this, a standard Academic Editors are known for.

Like

I found this read on the Misema River Bridge project absolutely captivating, engineering wonders like this always catch my attention. I recently had a project on infrastructure design, and while digging into my research, I stumbled upon Journal Publishing Service. Their journal article editing service in the USA really helped me polish my technical write-up and make sure it was up to snuff for academic publishing. Such an insightful blog, thanks for sharing!

Like

© Louis W. Bray Construction - Est. 1972 

  • Facebook
  • Linkedin
bottom of page